Portakabin launches the highest performing floor option for a modular building
09/12/2008
The latest
innovation for the Portakabin
off-site building system is a new high performance floor option for high
traffic areas and heavy, variable loads.
With a point
loading of 7kN and a uniformly distributed load of 9kN/m2, the factory-installed concrete floor is believed to be the highest performing floor for a modular
building.
It has been
launched by Portakabin, following a two-year development and testing programme
and offers a range of benefits for steel-framed modular buildings with areas of
high footfall or heavy point loading - from offices to education and leisure
facilities, healthcare buildings such as clinics, wards and hospitals and chemical
and pharmaceutical applications such as laboratories.
Features of the
new floor option include:
-
Point loading of 7kN
-
Acoustic
performance which meets the most stringent Building Regulations* requirements
for airborne sound and footfall (*Building Regulations 2000 Part E)
-
Uniformly distributed load of 9kN/m2
-
Shorter
programme times
-
All
the advantages of off-site construction - superior quality, less material waste
and less disruption
-
Six-storey
building capability
-
Improved
site safety and site cleanliness as the concrete is pre-installed in the
factory
- A highly durable terrazzo flooring
option, which is factory installed.
Commenting on the launch, David Shaw, Marketing
Director of Portakabin, said, "This new option will allow all the benefits of
off-site construction to be applied to an even wider range of building uses -
for example, school or university buildings with high levels of footfall or
health sector buildings such as clinics, wards and hospitals where acoustic
performance and heavy loading are key factors."
"As part of our commitment to design and innovation,
we are continually looking at new product developments and manufacturing
initiatives to further improve the sustainability, performance and design flexibility
of our award-winning off-site building system."
A dedicated
concrete floor casting bay has now been installed at the Portakabin production
centre in York,
integrating the pre-installed concrete floor option into the steel-framed
module manufacturing process. The
development of the new floor option also involved the construction of two
prototype modules for extensive testing, and detailed design calculations, and
module lifting and transport trials.
The
pre-installation of concrete into modules in a factory environment is easier
and safer than on a building site.
Concrete can be poured into individual modules which are accessible from
most sides, reducing, and in some cases eliminating, the need for extended
chutes and pumps. It also allows the
grinding and polishing of terrazzo flooring to be carried out under
factory-controlled conditions, for cleaner, safer and quieter work on site.
Portakabin are
also currently offering the opportunity to visit the York manufacturing site to see first hand the
benefits of modular construction, including a viewing of the new high
performance floor option.
For further
information about the new high performance floor or to arrange a visit to the
factory, call 0845 355 5359 or visit www.portakabin.co.uk/high-performance-floor.html